+1 587-887-2651Western Canada

TRANSFER SWITCHES & DISTRIBUTION

Make backup power part of a properly planned system.

Transfer equipment, essential-load distribution and electrical integration for buildings that need a defined plan when normal power is interrupted.

Illustrative dedicated automatic transfer switch and distribution cabinets in a commercial plant room
Transfer switches & distribution

A practical scope, built around you.

A generator only helps if the building can use its power through a suitable electrical arrangement. The transfer method, service configuration, connected loads and controls all need to fit the application.

We plan transfer and distribution work around the existing installation and the desired behaviour during an outage. Whether the requirement is a limited group of essential circuits or a broader building supply, the scope should clearly explain what will transfer, how it will operate and what remains outside the backup system.

What the work can include

  • Automatic and manual transfer project planning
  • Transfer equipment replacement and integration
  • Essential-load panels and distribution arrangements
  • Generator connection and control coordination
  • Feeder, disconnect and associated electrical work
  • Operating checks and planned maintenance coordination

Start with the right information.

Share the generator information, building supply details and any existing drawings. Voltage, phase, current, switching arrangement, neutral and grounding design, service-equipment requirements and local approvals must be assessed for the installation. Equipment selection follows that review rather than an assumption based on generator size alone.

Every property is different. The proposed work, schedule, access requirements and any specialist coordination are confirmed for your specific site.

How we plan the project

  1. Define the operating sequence

    Clarify what should happen during a loss of normal supply and when it returns.

  2. Review the electrical arrangement

    Assess the supply, generator, distribution, controls and design requirements.

  3. Coordinate installation and shutdown

    Plan access, isolation and sequencing with the building and other project participants.

  4. Verify the intended operation

    Agree the functional checks and owner handover appropriate to the completed scope.

Common questions

Do I need an automatic transfer switch?

It depends on the application and the required operation. Automatic and manual arrangements have different uses; suitability is assessed against the building, loads and applicable requirements.

Can an existing transfer switch be reused?

Possibly, subject to its ratings, condition, configuration and compatibility with the proposed system. Clear nameplate photos and drawings are useful starting information.

Can only part of a building have backup power?

Yes, many projects focus on defined essential loads. The distribution and transfer arrangement must be designed to serve those loads appropriately.

Related electrical services

Ready to discuss the details?

Share the location, scope and timing. We’ll start with the details that matter.